Campsie, Australia

Creative & Cultural Precinct

 

Arts + knowledge hub for Sydney’s west.

Campsie is one of Sydney’s thriving food, culture and lifestyle destinations. Meck was hired to work with Canterbury Bankstown Council to enhance this reputation by delivering a site-specific structure plan for a new Cultural Precinct in the heart of the town centre. Meck collaborated with Council’s urban design team, economic feasibility consultants and heritage experts to deliver a robust structure plan to guide the precinct’s evolution into a dynamic cultural hub.

 

Part of a Larger Master Plan

Meck’s precinct structure plan achieved best practice urban design outcomes that was aligned with a broader Campsie Town Centre master plan. That plan identified the cultural precinct as a priority area for more detailed study.

 
 
 

Proposed Structure Plan

The proposed precinct structure plan was a long-term strategy that balanced the needs for new cultural floorspace, housing, public domain, heritage conservation and programming. A community and cultural hub was identified to be delivered as a standalone building in a ‘Phase 1’ development that was feasible and in the best location possible within the precinct.

 
 

Economic Feasibility, Mix & Massing Studies

Meck collaborated with economic feasibility consultants to test a variety of outcomes and ensure proposed built form envelopes and mix of uses were viable and balanced high quality public domain outcomes with heritage conservation. Meck’s recommendations set the foundation for future LEP and DCP changes.

 
 
 

Phase One Implementation Underway

Following the adoption of Meck’s precinct structure plan, Council commissioned award-winning architects, Studio Hollenstein, to lead the detailed investigations and preparation of a concept design for the Stage 1 multi-purpose arts and cultural hub building and the new civic plaza.

Campsie Hub

Image Source: Studio Hollenstein

 

Location
Campsie, NSW


Scale
Medium


Client
Canterbury-Bankstown Council


The Team
Council Staff, Meck Studio


Additional Information
Campsie Master Plan

 
Previous
Previous

Building back strong after bushfires and floods.

Next
Next

Heritage streets, today